The Diocese Of Liverpool
£1,089,000
Project Contract Value
2025
2x Primary School Decarbonisation Projects
MEP Design
Mechanical and Electrical Services Design
MEP Contracting
Mechanical and Electrical Services Contracting
Mantis are supporting the Diocese of Liverpool with the full feasibility, design, project management and contracting of 2x building decarbonisation programme,.
We are delivering end-to-end solutions from RIBA Stage 4 detailed design through to construction and handover.
Project Scope and Objectives
Following a successful PSDS 4 grant application, Mantis is delivering a comprehensive decarbonisation programme for two primary schools within the Diocese of Liverpool. The programme encompasses:
-
Full Feasibility Studies and PSDS 4 funding applications
-
RIBA Stage 4 Detailed design and project management
-
Mechanical, Electrical, and building services upgrades to reduce carbon emissions and improve energy efficiency
-
Engagement with school staff and stakeholders to encourage active participation in low-carbon initiatives
The project aligns with the Diocese’s Net Zero goals, ensuring sustainable, energy-efficient environments for students and staff.

Mechanical & Electrical Design (RIBA Stage 4)
Mantis Energy’s design team has produced detailed mechanical and electrical designs, including:
-
Heating system designs and plant room layouts
-
Hot and cold-water services schematics
-
Ventilation, mechanical extraction, and BMS controls
-
Internal and external plant designs
-
Mechanical & electrical systems integration
-
Comprehensive design reports supporting contractor tendering
This technical design ensures that all interventions meet operational requirements while optimising energy performance.

Scope of Works
Our project & contract management team provides full support to the following works being completed on site:
- Cavity wall insulation (CWI), loft insulation and draught proofing
- Installation of thermally efficient windows and doors
- Electrical infrastructure upgrades (DNO)
- On site electrical power supply upgrades with consumer board and building management system (BMS) upgrades
- Installation of improved ventilation systems
- Decommissioning of fossil fuel heating systems and distribution
- Installation of low carbon air to air heat pump systems with heat recovery (VRF) technology.
- Making good and all associated building works
Regular meetings, webinars, and on-site school engagement are conducted to raise awareness and encourage participation from school communities.

Construction Phase Delivery
During construction, Mantis Energy will oversee:
- Production of construction issue drawings and specifications
- Review and sign-off of contractor and specialist designs
- Procurement of Insulation and Low Carbon Heating Systems
- Quality control and supervisions of contractors
- Mechanical & Electrical commissioning and completion reports
- Pre-handover defect schedules and final handover documentation
Our team ensures the project is delivered safely, efficiently, and to specification, minimising risk to the Diocese and school operations.