The NHS Nye Bevan health centre is a large building and a part of the Greater Manchester NHS public sector building stock all required to reach net zero by 2040.

Detailed site surveys were conducted by our team to assess the current building fabric condition and mechanical & electrical systems which were then reviewed as part of the Heat Decarbonisation process.

Challenges

  • Complex healthcare building with varied operating requirements.

  • Ageing heating and ventilation systems approaching end of life.

  • Thermal performance of roof, walls, and windows.

  • Need to maintain uninterrupted clinical operations during works.

Our Approach

  • Decarbonisation Work: Produced Heat Decarbonisation Plans, assessing viability and funding options.
  • Intrusive Inspections: Conducted air pressure testing, cavity wall borescope inspections, roof sampling, and detailed utility assessments.
  • Funding Application: Compiled comprehensive evidence for future decarbonisation planning

Outcomes

  • A clear, phased plan to decarbonise the centre.
  • Improved thermal efficiency through roof, wall, and window upgrades.
  • Clear low carbon heating pathways to decarbonise heating system
  • Long-term reductions in energy use and carbon emissions aligned with NHS net zero goals.