Skip to Content

Darwen NHS Health Care Centre

Darwen

Blackburn with Darwen, North West

Healthcare

Lancashire & South Cumbria NHS Trust

Energy

Decarbonisation Strategy and Plans

MEP Design

Mechanical and Electrical Services Design

Mantis supported Darwen NHS Health Centre in delivering a full Net Zero Carbon strategy, from early feasibility through to detailed design.

Our work included technical surveys, energy modelling, mechanical design, and fabric upgrades, with a focus on replacing fossil fuel heating with low-carbon heating solutions.

Challenges

  • Complex healthcare building with varied operating requirements.

  • Ageing heating and ventilation systems approaching end of life.

  • Poor thermal performance of roof, walls, and windows.

  • Need to maintain uninterrupted clinical operations during works.

Our Approach

  • Decarbonisation Work: Produced Heat Decarbonisation Plans, assessing viability and funding options.
  • Intrusive Inspections: Conducted air pressure testing, cavity wall borescope inspections, roof sampling, and detailed utility assessments.
  • Funding Application: Compiled comprehensive evidence for a successful Public Sector Decarbonisation Scheme (PSDS) bid.
  • Design Delivery: Provided heating distribution design, mechanical plant room layouts, and tender documentation for contractor with detailed design selection.

Outcomes

  • A clear, phased plan to decarbonise the centre.

  • Improved thermal efficiency through roof, wall, and window upgrades.

  • Detailed mechanical design ready for capital project delivery.

  • Long-term reductions in energy use and carbon emissions aligned with NHS net zero goals.

Contact us to find out more

If you are thinking about making your home more energy efficient or you have grand plans to build your own net zero carbon home then you have come to the right place.